Concrete Math Practice for the Contractor License Test (15 Questions)

Fail a contractor license test and you pay the fee again and wait for the next open date. Say the retake is $100 and the wait is three weeks. That is $100 gone and three weeks you can't bid under your own license. (Example numbers. Check your state.) Many of these tests have math on them, and it is the same math you do on every job. Here are 15 practice questions with the answers worked out. Free, no sign-up.

The answer key prints on its own page.

What is on your test

  • Every state is different. Some test the concrete trade. Some only test business and law. Some have no state concrete license at all, and the city or county handles it.
  • One example: California's C-8 Concrete test lists Planning and Estimating as about 28% of the test. It is closed book, and its study guide says some questions need math. You can read that in the state's C-8 study guide.
  • Get the exam guide from your own state or city licensing board. It tells you what is covered and what you can bring.
  • These are practice questions for the math. They are not copied from any test. This page comes from the maker of SlabBid Pro. It is not tied to any licensing board or testing company.

The math to know cold

Cubic yards = length × width × thickness (all in feet) ÷ 27

Inches to feet: divide by 12

Round area = 3.14 × radius × radius (the radius is half the distance across)

Bars one way = (distance ÷ spacing) + 1

Bid at a margin = cost ÷ (1 − margin). For 25%, divide by 0.75.

Margin = what you keep ÷ the bid price

Round yards to two places. All dollar figures are example numbers. On a real job, thickness, bar size, and bar spacing come from the plans or your local code.

15 practice questions

Pick one answer for each. Then tap "Check my answers" at the bottom.

1. A slab is 30 feet by 40 feet and 5 inches thick. How many cubic yards of concrete is that?

2. You add 10% for waste to the slab in question 1 and round up to the next whole yard. How many yards do you order?

3. A footing is 120 feet long, 20 inches wide, and 10 inches deep. How many cubic yards is it?

4. A wall is 40 feet long, 9 feet tall, and 8 inches thick. How many cubic yards is it?

5. A round pad is 16 feet across and 6 inches thick. Use 3.14 for pi. How many cubic yards is it?

6. You have 12 round piers. Each is 12 inches across and 4 feet deep. Use 3.14 for pi. How many cubic yards for all 12?

7. A slab is 24 feet by 36 feet. Bars go 18 inches apart both ways, with a bar at each edge. How many feet of bar is that, before laps?

8. Add 10% for laps to the bar in question 7. How many 20-foot sticks do you order?

9. The 30 × 40 slab gets a 4-inch gravel base. A cubic yard of this gravel weighs 1.4 tons. How many tons is that, with nothing extra added?

10. You bid $9,600 on a 30 × 40 slab. What is the price per square foot?

11. A job costs you $6,000. You want a 30% margin. What do you bid?

12. A job costs $5,000. You mark it up 20%. What is your margin?

13. A pour takes 5 workers 6.5 hours each. Labor costs $35 an hour. What is the labor cost?

14. How many cubic yards is 162 cubic feet?

15. How many square feet does one cubic yard cover at 4 inches thick?

Check my answers

Right0 of 15
Not answered15
Score0%

Passing scores are different from test to test. Check your own exam guide.

Answer key with the math

1. B. 30 × 40 × 5 ÷ 12 = 500 cubic feet. 500 ÷ 27 = 18.52 yards.

2. C. 18.52 × 1.10 = 20.37. Round up. Order 21 yards.

3. B. 120 × (20 ÷ 12) × (10 ÷ 12) = 166.67 cubic feet. ÷ 27 = 6.17 yards.

4. B. 40 × 9 × (8 ÷ 12) = 240 cubic feet. ÷ 27 = 8.89 yards.

5. B. The radius is 8 feet. 3.14 × 8 × 8 = 200.96 square feet. × 0.5 foot = 100.48 cubic feet. ÷ 27 = 3.72 yards. (14.89 is what you get if you use 16 as the radius.)

6. B. The radius is 0.5 foot. 3.14 × 0.5 × 0.5 × 4 = 3.14 cubic feet each. × 12 = 37.68 cubic feet. ÷ 27 = 1.40 yards.

7. C. 24 ÷ 1.5 = 16 spaces, so 17 bars × 36 feet = 612 feet. 36 ÷ 1.5 = 24 spaces, so 25 bars × 24 feet = 600 feet. Total 1,212 feet. (1,152 forgets the extra bar on each side.)

8. C. 1,212 × 1.10 = 1,333.2 feet. ÷ 20 = 66.66. Round up. Order 67 sticks.

9. B. 30 × 40 × (4 ÷ 12) = 400 cubic feet. ÷ 27 = 14.81 yards. × 1.4 = 20.74 tons.

10. B. 30 × 40 = 1,200 square feet. $9,600 ÷ 1,200 = $8.00 a square foot.

11. C. $6,000 ÷ 0.70 = $8,571. You keep $2,571. ($7,800 is a 30% markup, which is a smaller number.)

12. A. $5,000 × 1.20 = $6,000. You keep $1,000. $1,000 ÷ $6,000 = 16.7% margin.

13. C. 5 × 6.5 × $35 = $1,137.50.

14. B. 162 ÷ 27 = 6 yards. There are 27 cubic feet in a cubic yard (3 × 3 × 3).

15. B. 27 cubic feet ÷ (4 ÷ 12) foot = 81 square feet.

Missed a few?

Each kind of question has a free guide that shows the math one step at a time: yards, footings, walls, rebar, gravel, and markup vs margin. For more pencil work, print the 13-problem worksheet.

After the test, this math is every bid.

SlabBid Pro figures the yards, rebar, gravel, labor, and margin from your measurements. Then it sends a clean quote with your logo by text or email. You can look through sample jobs in the app before you start the free trial.

Get SlabBid Pro on the App Store

Free for 7 days. iPhone and iPad.

More guides: Concrete cheat sheet · Concrete price per square foot · How to figure concrete labor cost