What to Put on a Concrete Quote

A number on the back of a business card is not a quote. A clear quote does two jobs. It helps you win the work. And it stops the fight later about what was included. Here is what to put on it.

The must-haves

  • Your company. Name, logo, phone, and email. A quote with a logo looks like a real business.
  • The customer and the job address. So there is no doubt which job this is.
  • The date and a quote number. You will need both when the customer calls back in three weeks.
  • The size. Length, width, and thickness. "24 × 24 garage floor, 4 inches thick" leaves nothing to argue about.
  • The finish. Broom, smooth trowel, stamped, or exposed. Say which.
  • What is included. Base, rebar or mesh, forms, saw cuts, sealer, cleanup. List what you are doing.
  • The price. One clear total. Break out the big extras, like tear-out or digging, on their own lines.

The lines that save you later

  • What is not included. Permits, dirt haul-off, fixing the lawn, moving sprinkler lines. If you are not doing it, say so.
  • How long the price is good. Concrete and steel prices move. "Good for 30 days" protects you.
  • Payment terms. How much down, and when the rest is due.
  • Changes. If the customer adds work, the price changes, and you agree on it in writing first.
  • Weather and timing. Give a start window, not a promise. Rain and cold move pours.
  • Hidden problems. Soft ground, buried junk, or a thicker old slab cost extra. Say that up front.
  • Cracks. Concrete can crack. Control joints help guide where. Many contractors put a plain line about this on every quote.

This is a general checklist, not legal advice. Rules on contracts and deposits are different in each state. Have a lawyer look over your terms once.

Don't change the numbers after you send it

Once a quote goes out, that is the price. If something changes, send a new version and mark it Rev 2. Keep the first one. Then you and the customer are always looking at the same paper.

Figure the deposit

Say the bid is $4,507 and you ask for 30% down. That is an example. Use what your state allows and what fits your business.

$4,507 × 30% = $1,352 down

The balance is $3,155, due when the job is done.

Deposit calculator

Balance due at the end$3,155
Deposit$1,352

Send a quote that looks like you mean it.

SlabBid Pro builds the quote from your numbers and puts your logo and company info on it. Send it by text, email, or PDF. Sent quotes lock, and changes go out as a new revision.

Get SlabBid Pro on the App Store

Free for 7 days. iPhone and iPad.

More guides: How to follow up on a concrete bid · How to bid a concrete driveway · Markup vs margin